After the material is cut out this is the first piece placed on the assembly line. Tube number one. Eventually tube number 2 gets adhered to number 1.
The first stage of a raft construction…tube number 1.
This entry was posted on Tuesday, April 21st, 2009 at 7:52 am and is filed under Outfitting Miss Behavin'. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.